01Schedule

Six brackets by power-unit count, for registration year 2026.

0–2 vehicles
$96.00
3–5 vehicles
$223.00
6–20 vehicles
$426.00
21–100 vehicles
$1,263.00
101–1,000 vehicles
On requestquoted after review
1,001+ vehicles
On requestquoted after review

02Composition

Each band carries one all-in price for the registration year. The figure quoted is the figure charged; nothing is added at checkout, and there is no renewal billing. The spread between the smallest and largest band is set by the states, not by us — our own work does not scale with fleet size.

03Bracket boundaries

The schedule is stepped, and the range from the lowest bracket to the highest spans three orders of magnitude. A single power unit either side of a boundary can change the total materially, which is why the count is confirmed rather than assumed from the register.

Related sections
Power-unit counting methodologyMethod A: the latest MCS-150. Method B: the twelve-month measuring period. Definitions and edge cases.
UCR and BOC-3: the distinctionSeparate obligations, separate authorities, separate frequencies. A row-by-row comparison.
The UCR annual cycleSeason opening, due date, enforcement date, and the consequences of late registration.

Roadway Compliance is a private filing service. Not affiliated with the FMCSA, the UCR Plan, or any government agency.